Iraq: Galiawa Group subsidiary Van Gypsum has commenced production at its new gypsum plant in Erbil. The present phase of the plant has a 30Mm²/yr gypsum wallboard line, alongside other gypsum product lines. Van Gypsum says that it will use 96% locally-sourced raw materials in its production.

The company plans to subsequently implement a second line to raise that plant’s gypsum wallboard capacity to 60Mm²/yr.